-
New generation ALC partition wall fast construction green building materials
Date:2020-08-18 22:32:30 Author:
JS Somatic aerated hollow lightweight partition wall panel is manufactured by adopting several inorganic materials after chemical reaction. It has a history of more than 100 years in Euro. In China, it has been researched and developed for nearly 20 years. It has experienced and improved a lot in manufacturing, installation and practical performance.
Outstanding Advantages:
1. Lightweight.
Since Onekin Green Panel is lightweight, the installation is very fast. Two skilled workers a pair can finish about 50m2/day, shortening construction period and labor cost. Lightweight characteristic also benefits the load of the foundation.
2. Low thermal conductivity.
The thermal conductivity for Onekin Green Panel is 0.1739W/m.k, so the wall system is good heat insulation. Information from our S.Korean customer, because of adopting Onekin Green Panel, the energy-saving rate is more than 85%.
3. Fireproof.
Onekin Green Panel is excellent fireproof wall panel. The main raw material MGO itself is fireproof.
For 100mm, TUV test report, standard BS 476 Part 22:1987, passed 132mins, qualified.
4. Resistance to insects and termites, also resistance to growth of mold and mildew.
5. Easy and fast construction
Tongue and groove side can speed our work for construction, and because our panel can be cut easily for correct size for doors and windows and corners, this can also speed a lot of our construction work.
6. Heat insulation and energy saving
Thermal conductivity is about 0.17w/mºK, while cement panel is 0.66q/mºk.
7. Sound insulation
For 100mm panel, the sound insulation is 39dB, for more sound insulation data for other thickness please ask our sales.
8. Green and no harm to human body
The raw materials for our panel are green and no harm, and the finished panel also be tested no harm to human body, we got Singarpore green lable which is very serious.
9. Save the cost of architecture
Much lighter weight than cement board, gypsum board,SIP panel, so can save the structure and base cost of the architecture, enlarge the living area of the architecture finished.
Fast construction can aslo save the cost, such as labore and bank cost, short the construction period and project managment cost.
And, the wall surface is flat enough after install our panel, can putty directly without motar, whcih also can save materials and labor cost.
We can save the total cost of our architecture 10%-30%.

Performance data:
Type
Spec.
Features
Weight
Fireproof
Sound Insulation
Interior wall panel
75mm
Length: 2m to 3.5m
Width:0.6m,can be customized
lightweight
36
>3h
≥35
90mm
38
>3h
≥36
90mm upper
Expansion screws
50
>3.5h
≥38
100mm
42
>3h
≥41
100mm upper
60
>3.5h
≥43
120mm
50
>3.5h
≥43
150mm
55
>3.5h
≥47
200mm
Sound insulation and good nail-holding
power
95
>5h
≥51
Exterior wall panels
150mm
Thermal insulation
98
>4h
≥51
200mm
High strength
110
>5h
≥55
Customized
customization
With steel mesh
Fire wall panel
45mm
Length:2.4m to 3.5m
Width:0.6m-customization
Long fireproof
>4h
≥55
120mm exclusive fire wall panel
>4h
Panel for fence
70mm
2.33*0.2*0.07m
Lightweight
Reusable and easy to be detached and move
48
>2h
≥45
Project Case


Compare with other wall panel:
|
|
JS ALC wall |
GRC panel |
Ceramsite panel |
Gypsum panel |
Cement panel |
Compound panel |
|
|
Weight |
90 |
38kgs |
90kgs |
75kgs |
75kgs |
90kgs |
60kgs |
|
120 |
50kgs |
-- |
-- |
100kgs |
-- |
80kgs |
|
|
150 |
55kgs |
-- |
-- |
-- |
-- |
-- |
|
|
Fireproof |
>3hrs |
1hr |
1hr |
0.5hr |
1hr |
>1hr |
|
|
waterproof |
yes |
yes |
yes |
no |
yes |
yes |
|
|
Convenience in decoration |
Putty directly |
Cement plaster first |
Cement plaster first |
Putty directly |
Cement plaster first |
Putty directly |
|
|
Corner and door panel |
yes |
no |
no |
no |
no |
no |
|
|
Long distance Trans. |
yes |
no |
no |
no |
no |
yes |
|
|
Cracks |
few |
few |
few |
few |
more |
more |
|
Prefab House
Prefab wall panel
Other building materials
JinSheng Housing Environmental Advantage
Jinsheng light steel section production lineAuthor: admin
Time: 2020-01-07
Jinsheng prefab house under constructionAuthor:
Time: 2020-01-08
Finished light steel public toiletAuthor:
Time: 2020-06-04
Light weight wall slap construciton siteAuthor:
Time: 2020-06-02






